Project delivery

From first scope to finished space.

Whole-home remodeling and ADU construction move from existing conditions to coordinated decisions, approvals, site work and handover. The exact sequence depends on the property and reviewing authority.

A construction sequence with decisions in view

Each stage helps identify what is established, what remains open and whose input is needed. This is an overview, not a contractual schedule.

  1. 01

    Feasibility & existing conditions

    Describe the intended result and inspect access, existing structures and services. Identify questions for an engineer, designer, utility or jurisdiction before assuming a layout or ADU path is buildable.

  2. 02

    Documented scope

    Translate decisions into drawings and a written scope: included work, exclusions, selections, allowances and items still under investigation. Compare the scope with the homeowner's priorities before committing to procurement.

  3. 03

    Specialist coordination & approvals

    Where required, coordinate design and engineering input and submit to the responsible planning and building authorities. Review comments may change the scope; approval requirements vary by property and jurisdiction.

  4. 04

    Procurement & site readiness

    Confirm critical dimensions and selections before ordering long-lead materials. Discuss delivery, staging, property protection, utility interruptions and access, especially if occupants remain in the home.

  5. 05

    Construction & checkpoints

    Sequence site work and relevant trades against approved documents. Review concealed conditions, necessary inspections and proposed changes in writing, including their cost and timing implications before authorizing changed work.

  6. 06

    Closeout & handover

    Walk through the result, record remaining items and organize available inspection, product and maintenance documentation. Define responsibility for outstanding items in the actual project agreement.

These stages describe a useful planning framework, not a guaranteed schedule or a promise that every review applies to every property.

Who helps decide what?

Illustrative decision roles only. Actual responsibilities belong in the signed scope and the applicable authority's requirements.

DecisionHomeowner inputTechnical or agency input
Scope & selectionsPriorities, use and selected productsCondition findings, drawings and trade coordination
Structure & servicesGoals and disruption toleranceQualified specialists where required; utility constraints
Approval routeProperty details and intended useReviewing jurisdiction determines applicable requirements
Changes & closeoutReview proposed adjustments and walkthrough itemsDocument work impacts, required inspections and records

What to prepare before the first conversation

  • A rough description of the house and desired changes; no precise address is needed in the planning studio.
  • Existing drawings or photos, if you have them, plus known repairs or access constraints.
  • Your decision priorities, occupancy needs and any dates that matter to you.

Official starting points

Agency pages are starting points, not a parcel-specific determination. Confirm the applicable jurisdiction and current requirements for your address.