Keep, repair, replace
List each room's function, what works and what needs investigation. Photograph visible conditions and note earlier alterations.
Whole-home remodeling · scope development
Discuss a whole-home remodel with KB Remodeling when layout, shared systems and construction decisions need to work together. We examine existing conditions, document what is included or unresolved, and connect the plan to a buildable sequence rather than treating each room as an isolated job.
Discuss a whole-home scope
A useful scope distinguishes documented work, open questions and decisions that need specialist or agency input.
List each room's function, what works and what needs investigation. Photograph visible conditions and note earlier alterations.
Before moving a kitchen or adding a bath, consider plumbing runs, electrical load, ventilation and existing structural openings.
Record flooring, tile, cabinetry, fixtures and appliances with dimensions, lead-time questions and an owner decision date.
Identify temporary kitchen/bath needs, protected access, dust isolation and possible shutdown windows if people stay home.
Walls and floors may conceal damage or outdated systems. Agree how discoveries are documented and reviewed.
Separate required repairs and approvals from optional design changes, so priorities remain visible.
Identify pain points, measurements, photos and known permit history.
Test proposed openings, wet-area moves and systems with qualified input where needed.
Document selections, unknowns, protection and the procedure for written changes.
Layout, structural changes, system upgrades, appliance and fixture selections, and which rooms stay usable during work. Late changes to these items are the most common source of change orders.
It depends on existing drawings, the number of design decisions, consultant input and the reviewing agency's plan-check process. Ask the agency for its current review steps for your scope.
California's Building Energy Efficiency Standards (Title 24, Part 6) apply to altered systems and new conditioned space. The 2025 standards apply to permit applications from January 1, 2026.
Usually document preferences first, then confirm sizes and quantities against the coordinated plan before ordering.
Yes. Prioritize the work, but review shared systems and approvals across phases so early work does not block later changes.
Keep the property questions, priorities and your own figures together before reaching out.