Skip to content
Home / Planning studio

Your planning studio / KB Remodeling

Shape your project brief.

Bring your goals, property questions and budget priorities into focus before discussing a remodel or ADU.

Your answers stay in this browser tab only until you choose to send the consultation form with your brief. They are not sent to KB or analytics while you plan. Closing the tab removes them; Reset removes them now.

Project

Which path are you considering?

Project brief

Service
Still deciding
Area
Not answered
Property
Not answered
Desired outcome
Not answered
Approximate area
Not answered
Constraints
Not answered
Occupancy
Not answered
Design readiness
Not answered
Budget lower end
Not answered
Budget upper end
Not answered
Target timing
Not answered
Priorities
Not answered

Questions to resolve

  • Which systems or walls require investigation?
  • How will rooms be used during construction?
  • Which selections must be decided before procurement?

Before a consultation

  • Collect any existing plans and a simple sketch
  • List non-negotiable goals and open decisions
  • Note site access, current uses and utility questions
  • Check the city-specific planning links
  • Separate your own budget figures from any future proposal

Compare the two paths

Neither path is automatically easier or permitted. Local jurisdiction and site conditions decide what can be built.

DecisionWhole-home remodelingADU
Primary goalRework how the current home functionsCreate an additional living space
Existing homeIdentify rooms, systems and structural dependenciesAssess siting or conversion conditions and utility connections
Site questionsInvestigate walls, systems and work accessInvestigate access, setbacks and local review for this property
Living arrangementsPlan occupied zones and temporary facilitiesPlan yard or garage access and construction separation
First conversationBring a room-by-room goal and existing plansBring a site sketch, existing plans and utility questions

Your budget worksheet

Enter only figures you choose. Blank fields count as zero; no prices are supplied by KB. Enter USD with up to two decimal places, without commas or currency symbols.

Subtotal of scope and allowances$0.00
Optional contingency$0.00
Your planning total$0.00

Your planning figures are not a contractor bid, market estimate, financing advice or guarantee.

Compare contractor proposals

Record up to three proposals side by side. All amounts are your entries in USD; arithmetic differences are not a valuation, a KB bid or a recommendation. Blank means unknown, not zero.

A difference only compares entered base plus optional contingency; scope, allowances, exclusions and schedule may differ.

Project readiness

Check only information you have gathered. This measures input completeness, not zoning eligibility, permit approval, contractor qualification or financing.

Next questions

  • Which inclusions and exclusions need written clarification?
  • Who supplies each allowance item, and what happens if its cost changes?
  • Which decisions or documents are needed before the next review?
  • Which existing structural, systems and finish conditions still need investigation?

Only this tab stores these notes. Nothing is sent with your consultation unless you explicitly include the comparison in the form. Avoid putting personal addresses in notes.