ADU preparation mistakes to avoid
Most ADU setbacks start before drawings: a design chosen before the lot is understood, utilities assumed, or records not checked. Each mistake below comes with the check that prevents it.
Mistakes and checklists
Preparation checklists for ADUs and whole-home remodels, linked to the deeper guides on scope, allowances, change orders and handover.
Most ADU setbacks start before drawings: a design chosen before the lot is understood, utilities assumed, or records not checked. Each mistake below comes with the check that prevents it.
A remodel's hardest problems usually trace back to preparation: scope that was never written down, selections made too late, or no plan for where the household lives. Each mistake below links to the guide that goes deeper.
Pause, document the reason, compare options and record approval before changed work begins.
An allowance is a placeholder for a selection; contingency is a reserve for uncertainty. Neither makes an unspecified scope complete.
Ask every bidder to respond to the same written brief and disclose exclusions and assumptions.
Walk through the scope, document open items and collect the operating information for the finished home.
These pages explain decisions in general. Service pages by community describe KB's work in a specific place; permit pages describe each authority. Nothing here confirms what applies to your parcel.