Continuous footings and stem walls
Perimeter concrete footings with a short wall that lifts a raised wood floor above grade. Depth, width, reinforcement and anchorage come from the engineer's plan.
Foundation Repair / Construction
A new foundation is the first thing built and the hardest thing to change later. KB Remodeling builds footings, stem walls and slabs to the structural engineer's design and the permit issued for the address, and coordinates how new work meets what is already there.
Discuss a new foundationWhat a foundation looks like is decided by the design, the soil and the building authority — not by the contractor's preference. Our job is to build exactly what the approved drawings show, in the order the inspections require, and to raise questions early when the drawings and the site disagree.
Most of the difficult decisions happen where new meets existing: an addition that ties into an older raised floor, an ADU near property lines or trees, or a rebuild that reuses part of an old foundation. Those interfaces are where we spend the most planning time.
Actual scope and methods depend on the site evaluation and the approved design.
Perimeter concrete footings with a short wall that lifts a raised wood floor above grade. Depth, width, reinforcement and anchorage come from the engineer's plan.
A concrete floor placed on prepared ground, often with thickened edges as footings. Base material, vapor retarder, reinforcement and under-slab plumbing are design decisions made before the pour.
Isolated footings under posts or beams in a raised floor, located from the framing plan.
Dowels, new footings beside old ones and transitions between raised and slab floors, detailed by the engineer for the specific condition.
Anchor bolts, hold-downs, sleeves for utilities and drainage set before concrete so they are in the positions the plans require.
| Aspect | Contractor evaluation (KB) | Licensed engineer | City or county inspection |
|---|---|---|---|
| Question answered | What is visible and what practical next step fits | What is causing it and what the design should be | Does permitted work match the approved plans |
| When | Before anything is decided | When movement, capacity, soil or design is in question | At permit stages during construction |
| Relied on for | Planning and pricing a defined scope | Professional engineering judgment and drawings | Code compliance of the inspected work |
The structural engineer designs the foundation and may observe parts of construction; a geotechnical (soils) engineer may set the design recommendations and observe excavations. The building authority for the address reviews the plans and inspects at the stages it requires, typically before concrete is placed. KB builds to the approved plans and keeps those parties informed when field conditions differ.
Permits →We read the foundation plan, soils report and survey together and list questions before pricing.
Lines and levels are set from the survey and plans; excavation follows, with spoils and access planned in advance.
Forms, reinforcement, anchor bolts and sleeves are placed and checked against the plans.
Concrete is placed after the required inspection; curing and protection follow before framing starts.
No. The foundation depends on the final structural design and the issued permit. Starting early risks building something that must be removed.
Sometimes. It depends on the building authority, the site and the engineer. Some hazard zones and slopes require one; your engineer and the authority decide.
Only if the engineer confirms the existing foundation can carry it and details the connection. Often new footings are needed alongside.
Not as a rule. Soil, slope, plumbing layout, floor-height matching and access all change the comparison. We price the design actually drawn.