Inglewood / ADU construction
ADU construction in Inglewood
Inglewood's Planning Division publishes ADU and JADU development standards under the city's municipal code, organized by type: attached, new detached, and conversion of an existing detached accessory structure. Building Safety publishes what an ADU plan set must show. Both shape a feasibility review before design.
What shapes this work here
Standards by ADU type
The City's standards treat an attached unit, a new detached unit and a conversion of an existing detached structure differently. Choosing the type is the first real decision.
What the site plan must show
Building Safety's handout asks for structures, utility services, drainage, trees and easements on the site plan, and notes more may be required for site conditions. Gathering those early avoids rework.
Garage conversion vs new
A detached rear garage is common; its condition and position relative to the house and lines decide whether conversion is practical.
First steps in this city
01
Read the City's ADU standards
Find the column for your ADU type.
02
Read the submittal handout
List what the plan set must show.
03
Survey the site
Structures, utilities, trees and easements.
04
Evaluate the garage
Slab, walls and roof.
What the scope usually covers
- Site evaluation comparing a new detached unit with converting an existing garage or accessory structure
- Foundation: new footing design, or assessment of an existing slab and shell
- Utility routes from the main service to the unit
- Build-out, final inspections and handover documents
- Site plan information gathered to the City's submittal checklist
Bring to the first conversation
- Property address
- Site sketch with structures, trees, slopes and utility locations
- Intended use of the unit
- Photos of the garage interior and slab if converting
- Any known easements or a prior survey
Questions homeowners ask
- Can I have both an ADU and a JADU in Inglewood?
- The City's standards address combining them on a single-family lot when both meet the standards; the City confirms for your property.
- Why aren't setbacks and sizes listed here?
- Numeric standards change and depend on the type and site. Read the City's current document; we confirm them for your parcel.
Official references
- City of Inglewood · ADU and JADU Development Standards (2024)
Planning Division standards under IMC Article 35 by ADU type: attached, new detached, and conversion of an existing detached accessory structure, plus JADUs inside the house.
- City of Inglewood · Building Safety ADU plan check submittal requirements
Minimum ADU plan-set contents: title sheet with existing and proposed areas, and a site plan showing structures, utility services, drainage, trees and easements; additional information may be required for site conditions.
- City of Inglewood · ADU resources
City ADU resource; confirm requirements for your property with Inglewood.
These references explain where to look; they do not confirm what applies to a specific parcel.
KB Remodeling · Greater Los Angeles
Have a home in mind?
Tell us about the house, the goal and the timing. Let's start the conversation.
Start the conversation