Skip to content
NY LDN TYO

KB / Santa Barbara planning reference

Santa Barbara cost guide

An editable owner-assumption model, not a Santa Barbara market quote. Separate construction, selection upgrades, soft costs and contingency so the arithmetic can be examined before bids arrive.

Regional planning reference by KB Remodeling. Project location and licensed scope are reviewed before any service is accepted; this resource does not establish a Santa Barbara office or local project history.

Owner-assumption worksheet

Loading Planning worksheet…

01 / PLANNING NOTES

Choose one basis for construction.

Use area multiplied by your assumed rate OR one direct construction allowance, never both. A room update may suit a direct allowance; a larger renovation, new home or ADU may use area only if the scope behind the rate is clearly defined. Complexity is your additional percentage, not a local multiplier supplied by KB.

  • Does the base include foundation, demolition, site work and systems?
  • Are selections already included in the base or truly additional?

02 / PLANNING NOTES

An unknown is not zero.

Leave unpriced items blank; the model withholds a complete total until every formula input is explicit. Fees, surveys, professional design, financing, temporary housing, furniture, landscape and utility charges may need separate allowances. No local fees are embedded here. Record an exclusion before comparing the result with a proposal.

  • Which allowances overlap and which are missing?
  • Which amounts need a written supplier, designer or agency answer?

A clearer first conversation.

Tell us the location and scope. The office reviews whether and how KB can help before accepting work.

Discuss the project