Some of the most useful decisions in a new or remodeled home are questions asked early: how the house stays comfortable, what happens during an outage or hazard, and how it can adapt as the household changes. Asked late, they become expensive changes. This guide lists those questions and the tradeoffs to weigh. It makes no claim that any feature resists a hazard, improves health or meets accessibility or code requirements.

Written · KB Remodeling

The short answer

Add a short section to the brief with your priorities for comfort (heat, cooling, daylight, noise, air), resilience (outages, local hazards, shutoffs, backup options) and future needs (aging, guests, work, a possible ADU). Record each as a question and a tradeoff, not a product choice. FEMA's Protect Your Property brochures and Ready.gov's outage guidance are useful starting points for hazard-specific questions.

Who this applies to

Owners writing a brief for a new home, replacement home or major remodel. It does not size equipment, design structure or specify accessibility features; those belong to licensed professionals and applicable codes.

01 · The decision

Comfort questions for the designer

Comfort is shaped by orientation, envelope, windows, shading, ventilation and the heating and cooling approach together. The 2025 California Energy Code sets minimum requirements for many of these; your goals can go beyond them. Describe what matters to you — a cool bedroom, quiet street-facing rooms, fresh air without opening windows during smoke — and ask the designer and mechanical engineer how the design addresses each.

Ask yourself

  • Which rooms overheat or stay cold today, and why?
  • How will the house be ventilated when windows stay closed?
  • Where can equipment be accessed for service without disrupting finished rooms?

02 · Comparing the options

Resilience: outages, hazards and shutoffs

FEMA's Protect Your Property brochures describe mitigation actions for specific hazards, including earthquakes, and Ready.gov's power-outage guidance stresses that a generator should be used only outdoors and away from windows. For a brief, turn those into questions: which hazards apply to this site, which household needs must continue during an outage, and what backup options the engineers consider appropriate. Backup power, water storage or hardening choices each carry tradeoffs in space, cost, maintenance and permits.

Resilience tradeoff matrix (questions, not recommendations)
Household needQuestion for professionalTradeoffs to weighDecision before design
Refrigeration and medical devices during an outageElectrical engineer: which circuits matter and what backup options fit?Space, noise, fuel or storage, maintenance, permitsWhich loads must continue, if any
Smoke daysMechanical engineer: how is filtered ventilation handled?Equipment access, filter upkeepPriority rooms
Earthquake or other site hazardsStructural/geotechnical engineer: what applies to this site?Design scope and costWhich hazards to address in the brief
Finding shutoffs in an emergencyContractor: where are water, gas and electrical shutoffs?Location and labelingAccessible, documented locations

03 · The decision

Future household needs

Households change: parents move in, children leave, someone works from home, mobility changes. Some adaptations are cheaper to plan now — blocking in walls for future grab bars, a ground-floor room that could become a bedroom, space left for a future ADU or equipment. Write the scenarios you want to keep open and ask the designer what each would require. Accessibility requirements, where they apply, come from codes and professionals; a brief records intent, not compliance.

Ask yourself

  • Which future uses do you want the design to allow?
  • Which of them need decisions now to stay affordable later?

04 · An example

Fictitious scenario: one page in the brief

A generalized, fictitious family writes one page: bedrooms that stay cool, filtered air on smoke days, the refrigerator and a medical device on during outages, and a ground-floor room for a parent later. The designer and engineers respond with options and tradeoffs; the family chooses which to include before pricing and records the rest as alternates. Nothing in the page names a product or size.

Ask yourself

  • Which of your priorities would change the drawings if added later?

Who answers which question

TopicAnswered by
Comfort strategy and envelopeDesigner and energy/mechanical consultants
Backup power and electrical loadsElectrical engineer or designer; utility for interconnection
Site hazards and structureStructural and geotechnical engineers; building authority
Accessibility requirementsApplicable code and design professionals
Priorities and tradeoffsOwner

A scenario to consider

Fictitious scenario: an owner adds a backup-power request after drawings are priced. Because the panel location and space were not planned, it becomes a change order; writing it into the brief earlier would have let the designer plan for it.

Planning scenario

Bring this to your conversation

  • Record comfort problems you want solved
  • List household needs that must continue during an outage
  • Ask which site hazards apply and who evaluates them
  • Note future uses the design should allow
  • Ask for tradeoffs, not products, for each priority
  • Decide inclusions before pricing; record the rest as alternates

One more question

Will following this guide make my home hazard-resistant?

No. It helps you ask the right questions early. Hazard performance depends on design, engineering, construction and the site, decided by qualified professionals.

Official references

For requirements specific to your property, consult the local reviewing authority.

About this guide

Published by KB Remodeling from the official sources cited. It is not attributed to an individual author and does not claim review by an architect, engineer or attorney. We receive remodel, ADU, new-home and rebuild inquiries; scope, licensing and location are reviewed before any next step.

Your next step