Planning a custom home for 2027: decisions to make before design, pricing and permits

Written in October 2026 for owners who hope to design or build in 2027. Instead of promising dates, it starts from where you are today — land not yet bought, land owned with no design, schematic design, in plan review, or permitted and pricing — and shows the next decisions, the records still missing and the work that can run in parallel.

Written · KB Remodeling

Public resource by KB Remodeling · The link and this general checklist contain none of your private answers or notes.

Method and how to cite

Method: original KB Remodeling synthesis of the official sources listed, checked on the dates shown in the guide. It describes questions and records to gather; it is not legal, engineering or permit advice and does not decide any project.

KB Remodeling. Planning a custom home for 2027: decisions to make before design, pricing and permits. https://kb-remodeling.com/resources/custom-home-readiness-before-design-pricing-and-permits (written 2026-10-13)

Written:

The short answer

Start from your current stage. Before buying land, confirm what the site and records allow. With land and no design, write a brief and budget range basis and commission site documents. In schematic design, test the design against budget and authority rules. In plan review, track corrections and pricing assumptions. Once permitted, compare proposals on the same scope. No step here comes with a guaranteed duration.

Who this applies to

Owners planning a new or replacement single-family home in California with a 2027 horizon. It owns readiness and sequencing; costs, land evaluation, architect selection and construction phases each have their own guide.

01 · When it applies

What is known now, what is announced and what is unknown

Observed as of October 13, 2026: the 2025 California Energy Code took effect January 1, 2026, and, from the same date, energy-code field verification moved to the Energy Code Compliance (ECC) Program, according to the California Energy Commission. California building codes are adopted in cycles by the Building Standards Commission.

Unknown: which later code edition, local amendment or fee schedule will apply on the date your application is filed. This guide does not predict them. Ask your designer which edition applies at submission and recheck before filing.

Ask yourself

  • Which code edition will apply on our likely submission date, and how will we confirm it?

02 · The decision

Readiness by stage

Find the row that matches you today. Each row lists what to decide next, which records are usually missing and what can happen at the same time. Moving to the next row before closing its records tends to create redesign or repricing later.

Readiness by project stage
Your stageNext decisionsRecords often missingParallel tasks
Land not purchasedMust-haves for a site; budget basis; walk-away conditionsZoning and authority information, survey, title, utility availabilityDraft the brief; line up professionals for due diligence
Land owned, no designBrief, priorities and budget range basis; design teamSurvey, title report, soils report if needed, utility informationInterview architects; collect existing records
Schematic designFit of design to budget and authority rules; key systemsZoning review, consultant input, preliminary pricing basisEarly contractor input; utility applications where relevant
Plan reviewResponses to corrections; pricing assumptions; selections affecting drawingsCorrection responses, consultant revisions, updated pricing basisPrepare bid documents; finalize selections that change drawings
Permitted, pricingContractor, contract terms, contingency, payment and draw structureComparable proposals on one scope, lender documents if financingSchedule pre-construction; confirm insurance and utility readiness

03 · What to ask for

Dependency roadmap you can print

This roadmap lists what each step needs and produces. It deliberately has no durations: authority review, consultant availability and owner decisions vary by project and cannot be honestly estimated in a general guide.

Custom-home preparation roadmap (no durations)
StepDepends onProducesWho leads
Brief and prioritiesHousehold goalsWritten briefOwner
Budget basisBrief; site factsRange basis with contingencyOwner with advisors
Site documentsLand under controlSurvey, title, soils as neededSurveyor, title, geotechnical engineer
Schematic designBrief, budget basis, site documentsDesign conceptArchitect
Design development and pricing checkSchematic designDeveloped drawings, updated pricingArchitect, contractor input
Permit submission and correctionsConstruction documentsApproved plansArchitect with authority
Contractor selection and contractApproved or near-final plansSigned contractOwner
ConstructionPermit, contract, financingBuilt home with recordsContractor

04 · An example

Fictitious scenario: aiming at 2027 from a vacant lot

A generalized, fictitious owner bought a lot in 2026 and hopes to start construction in 2027. The readiness table shows the survey and soils report are still missing, so the owner commissions them while interviewing architects, rather than starting design without them. The owner writes no start date into the brief; the target is revisited after schematic design and again after plan review.

Ask yourself

  • Which record, if it surprised you, would change the design the most?

Where each topic lives

TopicGuide
Costs and contingencyCustom-home budget guide
Land evaluationLot guide
Design teamArchitect guide
Phases and constructionBuild timeline guide
Energy codeEnergy guide

A scenario to consider

Fictitious scenario: an owner in plan review wants to change a window wall. Because it changes drawings, it is decided before resubmission rather than during construction.

Planning scenario

Bring this to your conversation

  • Identify your current stage
  • List the records missing for that stage
  • Start parallel tasks that don't depend on those records
  • Confirm which code edition applies at submission
  • Revisit targets after each milestone, not before
  • Keep durations out of commitments until they are evidenced

One more question

Can I be sure to start building in 2027?

No guide can promise that. Start dates depend on records, design, review, pricing and financing. The roadmap helps you remove avoidable delays, not guarantee a date.

Official references

For requirements specific to your property, consult the local reviewing authority.

About this guide

Published by KB Remodeling from the official sources cited. It is not attributed to an individual author and does not claim review by an architect, engineer or attorney. We receive remodel, ADU, new-home and rebuild inquiries; scope, licensing and location are reviewed before any next step.

Your next step

Discuss scope and location

Where local context matters

All local planning resources

KB Remodeling · Greater Los Angeles

Have a home in mind?

Tell us about the house, the goal and the timing. Let's start the conversation.

Start the conversation