Inspection records, corrections and systems commissioning

During construction, the building authority inspects work in stages, energy-code verification may require separate field testing, and installers start up equipment. Each produces records that owners rarely see until something is missing. This guide shows which records to expect, who produces them and how corrections are closed, so the closeout file is complete before handover.

Written · KB Remodeling

Public resource by KB Remodeling · The link and this general checklist contain none of your private answers or notes.

Method and how to cite

Method: original KB Remodeling synthesis of the official sources listed, checked on the dates shown in the guide. It describes questions and records to gather; it is not legal, engineering or permit advice and does not decide any project.

KB Remodeling. Inspection records, corrections and systems commissioning. https://kb-remodeling.com/resources/inspection-records-and-commissioning (written 2026-10-13)

Written:

The short answer

Ask your contractor for an inspection and corrections log, copies of required energy-code verification documents, and start-up records with operating instructions for each system. In the City of Los Angeles, LADBS says work must be inspected before it is covered or concealed and is generally inspected and approved in stages. In California, energy-code field verification and diagnostic testing moved from the HERS Program to the Energy Code Compliance (ECC) Program effective January 1, 2026.

Who this applies to

Owners of permitted remodels, ADUs and new homes during construction. The closeout guide owns the final walk-through, punch list and first-year care; the energy guide owns which code edition and compliance path apply.

01 · When it applies

Five things that are easy to confuse

An inspection approves a stage of work under a permit. A final inspection or sign-off closes the permit for that scope. Occupancy authorization, where the authority issues one, allows the building to be used; LADBS, for example, offers temporary certificates of occupancy. A punch list is the owner's and contractor's list of incomplete or unsatisfactory items under the contract. A warranty covers defects for a period after completion under its own terms.

None implies the others. A passed final does not mean the punch list is done, and a finished punch list does not close the permit.

What each document confirms
DocumentIssued byConfirmsDoes not confirm
Stage inspection approvalBuilding authorityThat stage met review at inspectionLater work, workmanship preferences
Final inspection / permit sign-offBuilding authorityPermitted scope closedContract completion or punch items
Occupancy authorization (where issued)Building authorityUse of the building as authorizedWarranty or finish quality
Punch list completionOwner and contractorContract items finishedCode compliance
WarrantyContractor or manufacturerCoverage terms after completionThat no defects exist

Ask yourself

  • Which of these documents will you receive, and from whom?

Source for this section

02 · What to ask for

Inspection and corrections log

Inspectors may approve work or issue corrections. Ask the contractor to keep a shared log, so each correction has an owner and a re-inspection result, and nothing is covered before approval.

Inspection and corrections log (blank)
Stage / inspectionDateResultCorrection notedResponsibleRe-inspected (date, result)

Source for this section

03 · What to ask for

Energy-code verification records

Some energy-code measures require field verification and diagnostic testing by a third party in addition to the building inspection. The California Energy Commission states that, effective January 1, 2026, these provisions moved from the HERS Program into the Energy Code and its new Energy Code Compliance (ECC) Program. Which measures need verification depends on the compliance documents for your project; ask the energy consultant or contractor which apply and when testing happens, since some tests need access before finishes close.

Ask yourself

  • Which measures in our compliance documents require field verification?
  • At what stage must each test happen?
  • Who orders the testing and keeps the registered documents?

04 · What to ask for

Commissioning: confirm operation and information

Commissioning here means confirming that installed systems start up, operate as designed and come with the information to run them — not a code certification. For each system, ask the installer for start-up or test records, settings, the manual and the warranty registration step, and ask to be shown shutoffs and filter or service access.

Verification of performance, where required or wanted, belongs to qualified testers or the design engineers. A demonstration by the installer is useful but is not the same thing.

Systems handoff record (blank)
SystemStart-up or test recordSettings recordedManual and warranty stepShutoff and service access shown
Heating and cooling
Ventilation
Water heating
Electrical panel and any solar/storage
Water and gas shutoffs

05 · An example

Fictitious scenario: a missing test before drywall

A generalized, fictitious owner reviews the log at framing and sees that a required duct test is not scheduled. The contractor books it before drywall, and the result goes into the verification records. At closeout the permit final, punch list and systems handoff are checked separately, and the owner keeps all three logs with the manuals. No inspection timing is assumed here.

Ask yourself

  • Which tests or inspections must happen before the next stage covers work?

Who produces which record

RecordProduced by
Inspection results and correctionsBuilding authority inspector; contractor tracks
Energy-code verificationQualified third-party verifier, as the compliance documents require
Equipment start-up recordsInstaller
Operating manuals and warrantiesManufacturer via installer or contractor
Punch listOwner and contractor

A scenario to consider

Fictitious scenario: an owner receives a permit final but no ventilation settings. The installer records the settings and demonstrates the controls before the punch list is closed.

Planning scenario

Bring this to your conversation

  • Ask for a shared inspection and corrections log
  • Confirm nothing is covered before its inspection is approved
  • Identify which energy measures require field verification and when
  • Collect start-up records, settings, manuals and warranty steps per system
  • Be shown every shutoff and service access point
  • Keep permit final, punch list and warranties as separate records

One more question

If the final inspection passed, is the project finished?

Not necessarily. The permit can be closed while contract punch items, operating information or warranty registration are still open. Track each separately.

Official references

For requirements specific to your property, consult the local reviewing authority.

About this guide

Published by KB Remodeling from the official sources cited. It is not attributed to an individual author and does not claim review by an architect, engineer or attorney. We receive remodel, ADU, new-home and rebuild inquiries; scope, licensing and location are reviewed before any next step.

Your next step

Discuss scope and location

KB Remodeling · Greater Los Angeles

Have a home in mind?

Tell us about the house, the goal and the timing. Let's start the conversation.

Start the conversation