Utility and site due diligence before you buy or price a lot

A meter on the lot shows that service once existed. It does not show that the service is big enough for a new house, or where a new one must go. Separate what is connected today from what each provider and agency must approve.

Written · Revised · KB Remodeling

Public resource by KB Remodeling · The link and this general checklist contain none of your private answers or notes.

Method and how to cite

Method: original KB Remodeling synthesis of the official sources listed, checked on the dates shown in the guide. It describes questions and records to gather; it is not legal, engineering or permit advice and does not decide any project.

KB Remodeling. Utility and site due diligence before you buy or price a lot. https://kb-remodeling.com/resources/lot-utility-due-diligence (written 2026-10-11)

Written:

In brief

For each service, find out who provides it, what exists today, and what the provider requires for a new house. Get those answers in writing from the provider, not from a map or listing.

01

Existing connection is not capacity

A lot can have a water meter, a sewer lateral or an electric service sized for a small older house. A new home with heat pumps, EV charging or fire sprinklers may need a larger or relocated service. Only the provider can say what a new service requires.

No public map tells you a parcel's available capacity, and this guide does not estimate it. Ask each provider what information it needs to answer.

Ask yourself

  • What size and location is each existing service?
  • Which provider confirms capacity for the planned house, and how?

02

Electric service

In the City of Los Angeles, LADWP takes requests for single-family residences through its residential construction service pages and publishes a Guide to Electric Service. LADWP says a meter spot verifies the correct placement of a new service panel. Safety or code rules may require a different location, and new construction is handled through its Connection Center.

Elsewhere, the serving utility may be Southern California Edison or a municipal utility. Confirm which utility serves the parcel before asking about service.

Ask yourself

  • Which electric utility serves the parcel?
  • Will the panel or meter location change for the new house?

03

Sewer or onsite system

Sewer connection is a public-agency process. In the City of Los Angeles, the Bureau of Engineering's S-Permit FAQ says the permit can be issued once all documents are ready, including Sewerage Facilities Charges, any required easement, sewer capacity and the constructed building. It also says the charge is due when construction and use trigger a net increase in flow or sewage strength.

Where no public sewer is available, an onsite wastewater system may be needed, with its own health-agency review. Ask the local building and health agencies which applies to the parcel.

Ask yourself

  • Is a public sewer available to the parcel, and is an easement needed?
  • Does the agency require a capacity review for this project?

04

Water service and fire flow

Water purveyors differ by parcel. Los Angeles County Public Works says its Waterworks Districts oversee water service installation in their district areas, including new service for properties that never had water service. Its process starts with a Service Locator lookup by address or parcel number to identify the purveyor, then a Fire Department contact.

Fire-flow and sprinkler requirements can affect the water service size. Ask the fire authority and purveyor early.

Ask yourself

  • Which water purveyor serves the parcel?
  • What fire-flow or sprinkler requirements apply?

05

Gas, easements and access

If the design includes gas, ask the gas utility how a new or modified service is requested and whether the existing line can be reused. Check the title report for utility easements that limit where you can build. Confirm legal and physical access for utility trenching and construction equipment.

Ask yourself

  • Do recorded easements cross the buildable area?
  • Can trenching reach the street connection points?

06

Who answers what

Utility companies decide service design and requirements for their systems. Public agencies decide permits, sewer connection and code compliance. Your engineers and designer translate the house into loads and demand. A seller or listing can describe what exists, but not what will be approved.

Ask yourself

  • Who on your team assembles utility load and demand information?

07 · What to ask for

Document handoff and an illustrative sequence

Start by identifying the provider for each service from the parcel's actual location; a city name does not settle it, and this guide does not claim any provider serves a given address. Then separate existing service from proposed demand: the load and fixtures of the new design, not the old meter, determine what the provider reviews. Only the provider can confirm capacity, the service path, any easement it needs and whether an upgrade applies; none of that is assumed here, nor is it free or completed within a set time.

Illustrative sequence, not a project record: the designer lists proposed electrical load and fixture counts; the owner confirms each provider for the parcel; the team submits the provider's application with the site plan; the provider responds with a service path or questions; temporary construction power is arranged separately from the permanent connection; the permanent service is coordinated with inspections. Keep account numbers and addresses inside provider applications, never in public tools.

Utility document handoff
ItemWho prepares itWho confirms itFeeds into
Provider for each serviceOwner, from the parcel locationEach providerApplication routing
Existing versus proposed demandElectrical/plumbing designerProvider reviewService sizing response
Site plan with service pathCivil engineer or designerProviderEasements and trenching scope
EasementsTitle report and surveyProvider and title officerLayout and budget
Temporary connectionBuilderProviderMobilization
Permanent connectionBuilder with designersProvider and building inspectorCloseout

Ask yourself

  • Which provider serves each utility at this parcel, confirmed by the provider?
  • Is the application based on proposed demand rather than the existing connection?
  • Are temporary construction power and the permanent connection tracked separately?

Documents and questions to request

ServiceAsk forFrom
ElectricServing utility; service-planning process; panel and meter locationLADWP or the serving utility
SewerSewer availability, connection permit, capacity review, easementCity or County public works
Onsite systemWhether one is required and the review processLocal health and building agencies
WaterPurveyor identity, new-service and fire-flow processWater purveyor; fire authority
GasNew or modified service processGas utility
Easements and accessRecorded easements; access for trenchingTitle report; survey

A scenario to consider

Illustrative scenario, not a client project: a buyer sees a water meter and assumes service is settled. The fire authority then requires sprinklers, and the purveyor's process shows a larger service is needed. The buyer prices that before closing.

Planning scenario

Part of the custom-home planning series: Custom home planning

Bring this to your conversation

  • Identify the provider for each service
  • Record existing service sizes and locations
  • Ask each provider how a new-house service is requested
  • Check the title report for utility easements
  • Confirm sewer availability or onsite-system needs
  • Keep written provider answers with the purchase file

One more question

If a lot already has utilities, is it ready to build?

Not necessarily. Existing connections may be too small or in the wrong place for a new house, and each provider and agency sets its own requirements. Ask them in writing.

Official references

For requirements specific to your property, consult the local reviewing authority.

About this guide

Published by KB Remodeling from the official sources cited. It is not attributed to an individual author and does not claim review by an architect, engineer or attorney. We receive remodel, ADU, new-home and rebuild inquiries; scope, licensing and location are reviewed before any next step.

Your next step

Discuss scope and location

KB Remodeling · Greater Los Angeles

Have a home in mind?

Tell us about the house, the goal and the timing. Let's start the conversation.

Start the conversation